In November during stormy and rainy weather conditions the vessel MV “SAGITTA” was loaded with 10,500 tons of Petrol coke.
This was carried out for the BP Coke Company with South Africa being the final destination. Our warehouse again proved its worth with its sliding roof segments. The efficient timing of the opening and closing of the roof enabled us to protect the goods against the weather, thus guaranteeing a speedy loading process.
Together with the vessel MV “GENCO CHAMPION” with approx 16,000 tons in October already two ships with loading capacities of over 10,000 tons have been successfully completed within a short time. Both ships were looked after by our Agency Department around the clock.

<< back